Reroute Advisor
Slab pipe blocked? Snap a photo, tell Sparky the load, get 3 code-compliant alternate routes in 30 seconds. With voltage drop and CEC citations.
Every tool in the kit, organized in 10 categories. 15 free forever, 22 more with Pro. Plus the $99 Founding 100 lifetime deal.
Pipe's already cut. Concrete won't move. Get a route — fast.
Slab pipe blocked? Snap a photo, tell Sparky the load, get 3 code-compliant alternate routes in 30 seconds. With voltage drop and CEC citations.
First 5 years. Don't know what you don't know. Sparky's got you.
Tips, tricks, knots, fishing methods, old-school advice. The stuff JWs know that's not in any book.
Foreman says 'grab a 1900 with a mud ring' and you don't know what either is. Snap a photo or type the term — Sparky tells you what to grab.
What to bring Day 1. Tools to buy, tools NOT to buy. How to talk to JWs. Common mistakes that get you fired.
Searchable dictionary of trade terms, abbreviations, and slang. MDP, feeder, homerun, sub, lug — 500+ terms.
Each apprenticeship year has a 10-12 week school block. What to expect, what to study, what calculator to bring.
Construction & Maintenance Electrician Red Seal practice. 100 questions, drill weak topics, real CEC 2024 material with cited answers.
Voltage drop, ampacity, conduit fill, box fill, motor calcs. Timed drills with step-by-step solutions.
The math you do all day — voltage drop, ampacity, conduit fill, load calc.
Conduit fill, voltage drop, box fill — the three calcs you do most. Deterministic, offline, instant.
13 systems covered — residential, commercial, industrial, control, fire alarm, data, low voltage. CA + US conventions.
Bidirectional wire ↔ breaker lookup. Pick load, distance, conduit type — get the right gauge.
Offsets, saddles, kicks, 90s. Math for EMT, IMC, rigid — shrink and shift in one tap.
Convert single to three-phase loads. Kilowatts, amps, line-to-line, line-to-neutral.
Unit conversion for trade quantities: length, power, area, current, voltage, temperature. Reads fractions.
Full residential and commercial load calculations matching OESC Rule 8-200 / NEC 220.82 worksheets.
HP → FLA, overload, conductor, conduit, breaker. Single and three-phase.
Torque values, lug specs, terminal data. Manufacturer lookups built in.
Temperature + conduit fill derate combined. Charts replaced with one input form.
Snap the print. Sparky reads the schedule, panels, symbols.
Snap the print, ask how to run it. Sparky reads the schedule and explains the run in your own wire-colour convention.
Photo of a panel → AI inspects it. Identifies brand, age, code violations, generates customer-facing report.
OESC · CEC · NEC indexed, plus the code safety rules. Cite-the-rule answers, not best guesses.
Q&A across OESC 29th, CEC 2024, NEC 2026. Ask in plain English — get the rule, citation, and explanation.
Free-form chat with code awareness. Knows the trade, cites code by jurisdiction, won't fabricate.
The code safety rules that keep you alive and inspection-ready — CSA Z460/Z462 lockout and the key code points. Free, no AI gate.
Symptom → test sequence → fix. 61 symptoms covered.
61 service-call symptoms → ranked causes → test sequence. Trip codes, dead circuits, flicker, more.
Hours, pay, photos, notes, daily reports, inspection prep — your record of every shift, ready when the question comes back.
Photo organizer per job. Before/during/after, tagged by floor, room, device. Cloud-synced for warranty work.
Clock in, clock out, set your rate. Your own record of every hour and your gross today — your real net after dues with Pro.
Save your work. Tag by site. Search later. Works offline.
Pick the job type, work an AI checklist, photo-gate each item, and hand the inspector a clean report only when it all passes.
Talk through your day at quitting time. Sparky turns it into a structured report for the PM — no writing at 6 PM.
CAN/ULC-S524 · NFPA 72 device counts, cable pathways, verification.
Square footage → device count + types per CAN/ULC-S524:2024 or NFPA 72. Smoke, heat, horn/strobe, pulls, panel.
Correct fire alarm cable type per pathway (Class A/B/X · Pathways 1-4). Conduit, plenum, fire-rated routes.
Pre-verification walkthrough for CAN/ULC-S537 commissioning. 100+ check items. Pass on first try.
Bonus: PV, EV chargers and storage when the job calls for it. CEC 2024 Section 64 · NEC 690/705/706.
PV array sizing. Consumption + roof + climate → array kW, panel count, inverter, DC/AC conductors, breaker.
Breaker, conductor, conduit, voltage drop, disconnect — per CEC 2024 Section 86 (now 100% of nameplate).
ESS sizing + code compliance per CEC 2024 Section 64 Part 9. Catches the 20 kWh indoor lithium limit.
Bonus: Class 1/2/3 separation, structured cabling, PoE budgets.
Required separation between Class 1/2/3 / data / LV and power circuits per CEC 2024 Section 16 / NEC 725.
Cat5e through fiber. Length limits, bend radius, TIA/EIA-568 termination, PoE budgets.